The Municipality of Obiliq has issued a public notification regarding temporary disruptions to local traffic flow. Residents and commuters are advised that a section of the “Hasan Prishtina” street in Obiliq will undergo necessary infrastructure rehabilitation on June 4 and June 5, 2026. The restricted hours for these engineering works are scheduled daily between 08:00 and 17:00.
The temporary suspension of vehicle circulation on this specific segment is mandated as part of a comprehensive project aimed at maintaining and improving the urban road infrastructure within the municipality. The scope of work detailed by the Municipality involves several critical elements designed to enhance both functionality and safety. Specifically, the maintenance includes the regulation and proper leveling of manhole covers belonging to the sewage and drainage network.
This effort aims to ensure these covers are set at the appropriate design grade relative to the street level. Furthermore, the project encompasses the rehabilitation of structural damages and pits found within the asphalt layers. These repairs are necessary to increase overall traffic safety and the longevity of the thoroughfare.
Consequently, the Municipality has confirmed that vehicle circulation will be temporarily suspended across the main affected segment of the road in Obiliq during the specified timeframe. Authorities advise the public to plan alternative routes and exercise caution when traveling through the area on the dates mentioned. These measures are deemed essential for completing the necessary upgrades to the local transportation network.
Topics: #obiliq #road #segment