The KRU “Gjakova” has issued a notice informing consumers about a scheduled power outage affecting two pumping stations on September 2, 2026. The outage is set to occur between 10:00 AM and 3:30 PM. The disruption will impact the pumping stations located in the Morinë area, specifically at the Border Point, and in Hereq.
Consequently, residents in these areas may experience interruptions or reductions in the supply of drinking water during the specified timeframe due to the planned power outage. The KRU “Gjakova” has advised the public regarding this necessary maintenance. The utility company expressed its gratitude to consumers for their patience and understanding as these works are carried out.
This scheduled power interruption is necessary for operations within the water distribution network of the gjakova region. Consumers are advised to prepare for potential service disruptions related to the pumping stations. The planned maintenance aims to ensure the continued reliability of the water supply infrastructure across the affected zones.
Topics: #gjakova #power #pumping