Construction work in Ferizaj has been temporarily suspended following an investigation conducted by the Central Labor Inspectorate. The regulatory body announced the halt to construction activities after identifying significant irregularities concerning the assembly of a crane on site. According to the Central Labor Inspectorate, the inspection revealed structural deficiencies in the crane assembly that were assessed to pose a serious risk to the safety and health of the personnel working at the location.
The official notice confirmed that the central authority determined that these identified issues required immediate attention. For this reason, the inspectorate issued a directive suspending all ongoing work until the labor department confirmed that all noted deficiencies had been fully eliminated and rectified. The measure is intended to ensure compliance with stringent workplace safety standards.
Authorities emphasized that the suspension remains in effect until comprehensive safety assessments are completed and the necessary structural corrections to the crane are verified by the regulatory body.
Topics: #inspectorate #central #labor